HRMC Obstetrics Unit
A 37,000 sq. ft. OB Addition

ProjectTeam
Edward S. d’Avi, AIA NCARB
Project Advisory
Frank Grella
Owner’s Project Manager
HKS Architects (Orlando)
Architect / Interiors
TLC Engineering for Architecture
MPE Engineers
Doug Wilson Construction, Enterprises
General Contractor
What we made happen
HRMC built its 4th floor Obstetrics Unit expansion on the roof of the existing facility above the interstitial space and the Operating Rooms for approximately $11.5 Million. The project consisted of 24 new, private Post Partum Rooms. Nine of the rooms will be existing 4 North rooms renovated to match the new OB unit finishes.
An eight (8) station holding nursery and a five (5) station Level 1 Nursery were constructed. Eight (8) LDR rooms and seven (7) Special Care Rooms have been constructed, and two (2) C-section rooms. A four (4) bed triage area was completed immediately adjacent to the entrance lobby. The unit has a private entrance/elevator accessible from Hickory Street leading into a two story atrium lobby area (shown below).
A major infrastructure feature was the construction of a 1,800 square feet penthouse which houses all the mechanical equipment that supports the unit. This is a 37,000 square foot addition to the East Building.